WLCB Translator Plan

Two new FM translators to bring WLCB to more of the Lakes Area.

FCC filing window: November 4 to 17, 2026

The Plan

Genoa City

89.3 FM, 95 W

Non-directional, about 72 ft above ground on an existing tower.

Twin Lakes

89.9 FM, 99 W

Non-directional, about 30 ft above ground on an existing tower.

Both rebroadcast WLCB 101.5 FM. Heights are planned figures and may change before filing.

What It Adds

23,774People Covered, Up From About 7,500
16,256New People Reached
91 sq miCoverage Area, Up From 42 sq mi
6,309Twin Lakes Residents, All Of Them

Predicted 60 dBu coverage from public FCC and Census data, before tree and building losses. Actual reception will vary.

Coverage Map

Darkest: 60 dBu Contour Lighter: Usually Good In A Car Lightest, Dashed: Possible In A Car

Lines show the 60 dBu service contour the FCC uses. The shaded areas are estimates of car reception at 50 and 40 dBu, cut off where a stronger station takes over. Actual reception depends on the radio, terrain and buildings.

People With Clean Reception

Estimated by census block, after predicted interference from other stations.

How It Works

WLCB Move Zones

101.3 Would End Co-Channel With WLGS-LP 101.5 Area: Spacing Not Reduced Dashed Line: 11.2 km From WLCB 99.7 And 100.1 Cover The Same Area

Screening areas only. No specific site is confirmed, and a move can't be filed until after the translator window closes.

Other Frequencies In The Move Area

FrequencyUsable AreaClosest To WLCBWhereFCC Path
101.3101 sq km3.2 kmNorthwestMinor Change
101.5 (Current)65 sq km0.7 kmNorth And NortheastSame Channel
92.932 sq km5.0 kmWestNeeds Showing
98.523 sq km2.1 kmNorthwestNeeds Showing
99.719 sq km5.2 kmNortheastNeeds Showing
100.119 sq km5.2 kmNortheastNeeds Showing
98.37 sq km9.4 kmSouthNeeds Showing

Areas within 11.2 km of WLCB that meet FCC minimum spacing. "Needs Showing" means a technical showing of reduced interference. This checks spacing only, not coverage, and no site is confirmed. 101.3 is the only new frequency with a simple FCC path.

What's Next

  1. Board adopts the localism bylaw and approves the applications.
  2. Applications are filed in the November 4 to 17 window.
  3. The FCC reviews them. If anyone conflicts with us, a point system decides.
  4. Once granted, we build each site and go on the air.

Nothing is filed yet, and a grant is not guaranteed.